Mechanical Laboratory
Location
South central part of Case campus
Description
Classroom and laboratory building of 2 stories with basement
Other Names
Mechanical Engineering
Mechanical Laboratory
Mechanical Building
Constructed
ca. 1891-1892
Razed
1928
Architect
Coburn and Barnum
Occupants
1892-1905: Mechanical Engineering Dept., Mining Engineering Dept.
1905-1927: Mechanical Engineering Dept.
Uses
1892-1927: Research and teaching
Trivia
First Case building designed by Coburn and Barnum
Alterations and Modifications
Description
1903: Added power laboratory
This summary was compiled by staff of the University Archives from sources in the custody of the Archives.
Previous Building A-Z List Next Building