Campus Location Map
1 2025-07-17T16:51:30+00:00 Julia Teran 9aca9c408841ff28b321d7128a1e5c918a151e1d 9 2 2025-07-17T17:24:07+00:00 CWRU Archives Unknown mapbelsw CWRU Archives Julia Teran 9aca9c408841ff28b321d7128a1e5c918a151e1dThis page is referenced by:
-
1
2025-10-22T13:40:18+00:00
Adelbert Gym, 1919
5
Adelbert Gym, 1919
plain
2025-11-25T13:12:54+00:00
southwest side of Adelbert Road, facing eastLocation
Description
Interior 90x175 feet, with walls of gray pressed brick; attached by hallway, on southwest part of building, to Adelbert Gym, 1888 and south part of building to Davis Building
This property continued in use after 1949. Post-1949 research is not yet completed.Other Names
Armory (Adelbert College)Constructed
1918-1919
Architect
Charles Hopkinson
General Contractor
Crowell-Lundoff-Little Co.
Cost
$175,000-$225,217.20 for construction of Adelbert Gym, 1919 and remodeling of Adelbert Gym, 1888
Financing
Gift of $40,000 from Samuel Mather; Gift of $10,000 from Jeptha Homer Wade; Gift of $10,000 from E.W. Oglebay; gifts of various amounts from various donors
Occupants
1919-1949+: Adelbert Physical Education Dept. and WRU Intercollegiate Athletics
Uses
1919-1949+: Athletics and recreation
Ceremonies
Dedication: 6/19/1919
Trivia
Third WRU gym
This summary was compiled by staff of the University Archives from sources in the custody of the Archives.
Previous Building A-Z List Next Building | Previous Building Chronological List Next Building -
1
2025-11-11T19:45:35+00:00
Mather Athletic Field, 1927
4
Mather Athletic Field, 1927
plain
2025-11-11T20:10:27+00:00
southeast corner of East Boulevard and Bellflower RoadLocation
Description
1927: athletic field 1947: 2 double tennis courts and one single court, 240x195 feet with 10 foot wire fence enclosure
This property continued in use after 1949. Post-1949 research is not yet completed.Other Names
1932-1948: Mather Athletic Field
Constructed
1927
Architect
1927: M. S. Douglass
Cost
1927: $5,967.62
Occupants
1927-1949+: Mather College
Uses
1927-1949+: Athletics, recreation and parking
Trivia
First Mather College athletic fieldAlterations and Modifications
Description
1927-1928: Unspecified alterations
Cost$2,500 Alterations and Modifications
Description
1947: Constructed 5 tennis courts and fence
Architect
The F. A. Pease Engineering Co.
General Contractor
Cuyahoga Asphalt and Paving Co.
Cost
$36,000 or $31,229
Financing
Operating fundsAlterations and Modifications
Description
1948: Moved everything but hockey field to northeast corner of East Boulevard and Bellflower Road for addition to Severance Hall parking lot
General Contractor
Cuyahoga Asphalt and Paving Co.
Cost
$13,193 estimated
Financing
Gift of $13,193 estimated from Musical Arts Associatio
Donors
Musical Arts Association
This summary was compiled by staff of the University Archives from sources in the custody of the Archives.
Previous Building A-Z List Next Building